Daikin Remote Controller BRC1C61 Installationshandbuch Seite 10

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 17
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 9
8 English
1.
Remove the control box lid. Connect the remote controller
and power supply (single-phase, 50 Hz 220-240 V or sin-
gle-phase, 60Hz 220V) respectively to the terminal block
and securely connect the earth also (as shown in the figure
below).
CAUTION
Securely clamp the cables with the clamps (9)(10) offered
as accessories as shown in Fig. 17 so that tension will not
be applied on the cable connection areas.
2.
Confirm that the control box lid is closed before turning on
the power.
3.
Remove the inspection lid.
4.
Gradually pour approximately 1L of water from the inspec-
tion window into the drain pan to check drainage.
CAUTION
Be sure to prevent an external force from being exerted on
the float switch.
(This may cause breakage.)
5.
Attach the inspection lid.
6.
Perform the following operation using the remote controller,
and check drainage.
Select the inspection/test operation button “ ” using
the remote controller. The unit will engage the test oper-
ation. Press the operation selector button “ ”, and
select FAN OPERATION “ ”.
Press the ON/OFF button “ ”. (The indoor fan and
drain pump will operate.)
CAUTION
The fan will turn also at the same time. Take due care.
Do not touch the drain pump to prevent electric shock.
7.
Make sure to use the remote controller in finishing the oper-
ation.
CAUTION
The connection opening on the drain piping may vary
depending on the model, so check the model name and use
the right method for that model.
Make sure all water is out before making the duct connection.
(1)
Install the drain piping.
Make sure the drain works properly.
The diameter of the drain piping should be greater than or
equal to the diameter of the connecting pipe (vinyl tube; pipe
size: 20 mm; outer dimension: 26 mm).
(not including the riser)
Keep the drain piping short and sloping downwards at a gra-
dient of at least 1/100 to prevent air pockets from forming.
(Refer to Fig. 14)
CAUTION
Water accumulating in the drain piping can cause the
drain to clog.
To keep the drain piping from sagging, space hanging
bracket every 1 to 1.5 m.
Use the drain hose (2) and the metal clamp (1). Insert the
drain hose (2) fully into the drain socket and firmly tighten the
metal clamp (1) with the upper part of the tape on the hose
end. Tighten the metal clamp (1) until the screw head is less
than 4 mm from the hose. (Refer to Fig. 15, 16)
The two areas below should be insulated because conden-
sation may form there causing water to leak.
Drain piping passing indoors
Drain socket
Referring the figure below, insulate the metal clamp (1) and
drain hose (2) using the included large sealing pad (5).
(Refer to Fig. 16)
In case of PBVET, NBVET type (without drain pump)
TEST
TRANSMISSION
WIRING
REMOTE
CNTRL
T1F1
FORCED
OFF
P2 F2P1 T2
TRANSMISSION
WIRING
REMOTE
CNTRL
T1F1
FORCED
OFF
P2 F2P1 T2
L N
NL
L N
Inspection window
Portable pump
Inspection lid
Refrigerant pipes
Bucket
Service drain hole
Drain outlet
(with rubber cap)
Indoor PCboard
(ASSY)
Terminal block
Terminal block
Remote controller
terminal connection
method
Power supply:
Single phase,
50 Hz, 220 V~
240V
Single phase,
60Hz, 220 V
Power terminal
connection
method
Drain socket
Refrigerant pipes
Connect the drain pipe after removing the rubber cap and
insulation tubing attached to the connection hole.
Central drain piping
(with a slope of at least 1/100)
Fig. 14
100mm
or more
Metal clamp (1)
Drain hose (2)
Tape
Fig. 15 Fig. 16
(accessory)
(accessory)
4mm
Large sealing
pad (5)
Metal clamp (1)
(accessory)
(accessory)
01_EN_3PN09042-1A.fm Page 8 Friday, March 21, 2008 7:21 PM
Seitenansicht 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 16 17

Kommentare zu diesen Handbüchern

Keine Kommentare