РóссêийEnglishDeutschFrançaisEspañolItalianoΕλληνικÜNederlandsPortuguesINSTALLATION MANUALTotal Heat ExchangerHRV (Heat Reclaim Ventilation) -with DX
8 English•Use the duct applicable to the model of unit used (Refer to the installation drawing.)•Install the two outdoor ducts with down slope (slope
English 910 WIRING EXAMPLE AND HOW TO SET THE REMOTE CONTROLLER10. 1 OPENING AND SHUTTING THE ELECTRIC PARTS BOX AND CONNECTING THE WIRINGCAUTIONBe su
10 English[4] Use round crimp-style terminals for connecting wires to the power supply terminal block.If unavailable, observe the following points whe
English 11〈〈〈〈Combined operation system with VRVII system (connected with HRV units and standard indoor units in a single refrigerant circuit)〉〉〉〉〈〈〈〈
12 English[PRECAUTIONS]There is not need to set the indoor unit address when using group control. (It is automatically set when the power is turned on
English 13EXAMPLE OF CONTROL WIRINGConnecting line can be extended up to 50m maximum.•Local wiringNote:The connecting wiring between HRV unit and the
14 English Settings and setting numbersNOTE)1. The inside the frame indicates the second code no. set when shipped from factory.2. The settings a
English 1511. 2 Perform a test run according to the outdoor unit’s installation manual.(1) Make sure the electric parts box of the unit is closed befo
16 English12 WIRING DIAGRAMVKM50·80·100GMV13D047684-1POWER SUPPLY220-240V~50HzADAPTER PC BOARD FOR WIRING(OPTIONAL ACCESSORIES)EXTERNAL OUTPUTTERMINAL
English 17VKM50·80·100GV13D048372-1A1PA2PC1·C2F1UF1UF1UT·F2UTHAPHAPK1R~K3RK4R~K6RK7RM1DM1FM2FR1TR2TR3TR4T,R5TS1QSS1T1RT2RPRINTED CIRCUIT BOARDPRINTED
Umeda Center Bldg., 4-12, Nakazaki-Nishi 2-chome,Kita-ku, Osaka, 530-8323 JapanDAIKIN INDUSTRIES, LTD.EN60335-2-40,VKM50GMV1, VKM50GV1VKM80GMV1, VKM80
EM03A096A (0504) 3P130768-1BFS HT00_3P130768-1B_CV.fm Page 2 Friday, April 1, 2005 8:39 AM
With DX coil &Humidifier VKM50GMV1VKM80GMV1VKM100GMV1With DX coil VKM50GV1VKM80GV1VKM100GV1Total Heat ExchangerHRV(Heat Reclaim Ventilation) -wit
2 Englishc. Place such as machinery plant and chemical plant where gas, which contains noxious gas or corrosive components of materials such as acid,
English 3FOR THE FOLLOWING ITEMS, TAKE SPECIAL CARE DURING CONSTRUCTION AND CHECK AFTER INSTALLATION IS FINISHED.a.Items to be checked after completio
4 English4 PREPARATIONS BEFORE INSTALLATION(1)Confirm the positional relationship between the unit and suspension bolts. (Refer to Fig. 2)Leave space
English 5(4)Check the unit is horizontally level.CAUTIONUse a level to make sure that the unit is level and that the tilt (downward slope) to the drai
6 English(4)Install the water supply piping. 〈〈〈〈VKM-GMV1 series only〉〉〉〉CAUTIONWhen installing the water supply piping, wash the pipes with tap water
English 7Tabl e 1•When connecting the flare nut, coat the flare section (both inside and outside) with ester oil or ether oil, rotate three or four t
Kommentare zu diesen Handbüchern