Daikin BRC1E51A7 Bedienungsanleitung Seite 22

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 58
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 21
20 English
Ventilation Operation
When Air Conditioner Interlocked with Total Heat Exchanger
Preparation
For mechanical protection purposes, turn ON the system at least six hours before starting the
operation of the system.
Do not turn OFF the system in season in order to ensure the smooth starting of the system.
Operation Method
1
Set temperature
20°C
Vent
Return Setting
Set the Operation mode selector button
to Ventilation in the case of operating
the total heat exchanger without the
system between seasons.
2
To change the ventilation mode setting, make
necessary settings from the main menu (see page 33).
Ventilation mode: Automatic, Heat exchange, and Bypass*
3
To change the ventilation rate, make necessary
settings from the main menu (see page 32).
Ventilation rate: Low or High*
4
Press On/Off button.
The Operation lamp (green) will be lit
and the system will start operating.
5
The Operation lamp will be turned OFF
and the system will stop operating when
On/Off button is pressed again.
Basic Operation Method (Use of Direct Buttons)
01_EN_EM08A085.indd 2001_EN_EM08A085.indd 20 4/7/2009 4:39:13 PM4/7/2009 4:39:13 PM
Seitenansicht 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 57 58

Kommentare zu diesen Handbüchern

Keine Kommentare